Keretapi Tanah Melayu: Quiz

Advertisements
  
  
  

Question 1: [10] The next major project was the Rawang-Ipoh double tracking and electrification project, which started in 2000, but the project has been repeatedly delayed by contractual disputes and not expected to be ready before ________.
2004200520062007

Question 2: The ________-Kuala Lumpur shuttle was finally launched on Dec 1 2008 running 10 trips a day.
IpohTanjung MalimPerakKampar, Perak

Question 3:

Question 4: Kuala Lumpur - Sentul - Batu Caves (Part of Sentul-Port Klang Route and Sentul-________ double tracking and electrification)
Nallur Kandaswamy templeSri Kandaswamy Kovil, BrickfieldsBatu CavesMurugan

Question 5: The double-tracking and electrification of 179 km of the main West Coast line will enable KTMB to run trains at a maximum speed of 160 km/h between Kuala Lumpur and ________.
Tanjung MalimIpohKampar, PerakPerak

Question 6: KTM drew its diesel rolling stock from a multitude of locomotive companies from England, Japan, ________, and more recently, India, Germany and China.
United KingdomUnited StatesBarbadosCanada

Question 7: The East Coast line runs between Gemas in Negeri Sembilan and Tumpat with Rantau Panjang, both in ________.
KelantanKedahPenangTerengganu

Question 8: 28 YDM4s on lease from Indian Railways, manufactured by Diesel Locomotive Works, Varanasi, ________ brought into Malaysia in the late 1990s.
IndiaResearch and Analysis WingIndia and the Non-Aligned MovementLok Sabha

Question 9: ________ - Port Dickson (Disused as of April 2009)
TampinSeremban (district)SerembanNegeri Sembilan

Question 10: The project will also feature a 3.3 km tunnel in ________, which will become the longest rail tunnel in South East Asia.
IpohPerakTaiping, PerakGopeng