The Full Wiki

Eurostar: Quiz

Advertisements
  
  
  
  

Question 1: [114] and that its remaining carbon emissions are now offset, making its services ________.
Carbon neutralityLow-carbon economyEmissions tradingRenewable energy

Question 2: [142] As part of the update process, the Italian company ________ has been contracted to redesign the interiors,[143] and The Yard Creative was selected to design the new buffet cars.
FerrariEnzo Ferrari (automobile)PininfarinaFerrari P4/5 by Pininfarina

Question 3: [126] Drivers are trained in techniques to achieve maximum energy efficiency, and lighting has been minimised; the provider of the bulk of the energy for the ________ has been switched to nuclear power stations in France.
TGVEurostarHigh Speed 1Channel Tunnel

Question 4: Eurostar is a high-speed passenger rail service connecting London with Paris and ________.
BerlinPragueAmsterdamBrussels

Question 5: [53] Linking the international platforms of Brussels-South railway station with the high-speed line, the viaduct separates Eurostar (and ________) from local services.
Intercity-ExpressTGVThalysBritish Rail Class 373

Question 6: Calling points in France are Calais-Fréthun and Lille-Europe, with the main Paris terminus at ________.
Gare de l'EstRERCharles de Gaulle – Étoile (Paris Métro and RER)Gare du Nord

Question 7: All its trains cross under the English Channel via the ________ between Britain and France, owned and operated separately by Eurotunnel.
Channel TunnelHigh Speed 1EurostarTGV

Question 8: In addition, there are limited services from London to ________ at Marne-la-Vallée - Chessy, and to seasonal destinations in southern France.
Walt Disney Parks and ResortsDisneyland ParisDisney VillageDisneyland Park (Paris)

Question 9: In 2004–2005 the "Three Capitals" sets still in daily use for international services were refurbished with a new interior designed by ________.
Philippe StarckMusée BaccaratNew MexicoIan Schrager

Question 10: These sets have a capacity of 558 seats: 114 first class, 444 standard and which were designed to operate the aborted ________ services.
St Pancras railway stationWest Coast Main LineRegional EurostarHigh Speed 1







Advertisements









Got something to say? Make a comment.
Your name
Your email address
Message